Below is a list of points that need rectifying.
- Missing towel rail and door handle in Ensuite
- Missing sink taps and towel rails in powder room
- Missing shower screen in main bathroom.
- Walls in bedroom, powder room, living and dining still need to be patched.
- Alarm system still needs to be installed
- Missing flood light on garage wall.
- Missing man hole in garage.
- Big chip in one of the tiles in the ensuite.
- Door and window tracts need a big clean out and detail.
- Some minor repainting required.
- 2 light switches and 1 light not working.
- Missing gas point on garage wall for future pool install.
- Some minor mortar cracking issues on the exterior.
- Silicon on a coupe of tiles that needs a proper clean off
- One of the bedrooms has a big lump under the carpet.
- Media room is missing lower wall HDMI power socket.
- Mirrors will be installed with appliances after NHP
- Pendant lights above kitchen island bench not installed.
Please see photos below.
| Front Facade | 
| Garage - Missing man hole. | 
| Office | 
| Ensuite. Note missing sliding door handle, towel rail and mirror | 
| Chipped tile in Ensuite | 
| Closeup of chipped Tile | 
| Walk in robe in Main Bedroom | 
| Looking towards front entry from living. | 
| Looking towards living from Front Door | 
| Living/Kitchen. Roof where the vent was moved needs patching | 
| Kitchen splashback | 
| Dining | 
| Walk in pantry | 
| Looking towards powder and main bathroom from dining | 
| Main bathroom - Missing shower screen | 
| Main bathroom 
 | 
| Laundry | 
| Wall needs patching and tape on floor marks area where there is a large bump under the carpet | 
 
 